Milton closes No. 3 Side Rd. for construction work

By

Published October 27, 2020 at 11:39 am

The Town of Milton will be closing No. 3 Side Rd. for an undetermined amount of time.

Located in the Milton Heights part of town, the road connects Tremaine Rd. to Peru Rd.

The closure will begin on November 1 and is due to the reconstruction of the road. Although the closure is temporary, it will be in effect until a street that runs through the Century Grove development is completed.

Construction is part of an overall re-working of the area that includes a realignment of Tremaine, an overpass of Sixteen Mile Creek and an interchange at Highway 401.

insauga's Editorial Standards and Policies advertising